Twitter
 

New Signs Will Ease Finding Your Way in the Dodge and Alfred Road Business Parks

  

The renderings shown below have been designed to ease way-finding in the Robert G. Dodge and Alfred Road Business Parks.  The proposed location of each sign is shown to the right of each rendering.  Click on each image for an enlarged view. 

The issue of these new signs will go before the Economic Improvement Commission for approval on September 7, 2016, then on to City Council for final action.  The date of Council action has not yet been determined.    

Contact Brad Favreau, Economic Development Coordinator, at (207) 571-1612 or bfavreau@biddefordmaine.org with comments or questions.

 

 

  1A_0001_(3).jpg

Proposed Location:

Alfred St. at Barra Rd.

  1B1_0001_(2).jpg

Proposed Location:

Alfred St. at Arena Dr.

  1B2_0001_(2).jpg

 Proposed Location:

Pomerleau St.

  2A_0001_(2).jpg

Proposed Location:

Barra Rd. at Pomerleau St.

  2B_0001_(2).jpg

Proposed Location:

Arena Dr. at Pomerleau St.

  3A_0001.jpg

Proposed Location:

Barra Rd.

  3B_0001.jpg

Proposed Location:

Pomerleau St. at Arena Dr.

  4A_0001.jpg

Proposed Location:

Barra Rd. at Healthcare Dr.

  5A_0001.jpg

Proposed Location:

Barra Rd. at Springbrook Dr.